ZLSSSCIENCE. INTEGRATED.Evaluate Your Field ->

ASSET ECONOMICS

Evaluate mature wells before expensive redevelopment.

Before spending major capital on redevelopment—or shutting producing wells down—evaluate whether existing wells can be economically optimized.

Find the opportunity in the assets you already have.

Screen wells for technically feasible, low-CAPEX modernization. Establish a defensible baseline before recommending equipment, controls or a broader redevelopment program.

Assess Existing Wells ↗

ENGINEERING SCOPE

  • Current production and decline behavior
  • Artificial lift configuration
  • Lifting cost and electricity consumption
  • Downtime, maintenance burden and workover history
  1. 01Existing mature wells
  2. 02Well screening
  3. 03Artificial lift assessment
  4. 04Energy baseline
  5. 05Retrofit
  6. 06AI optimization
  7. 07Measurement & verification
  8. 08Scale-up

MEASUREMENT & VERIFICATION

Prove the difference.
Then scale it.

A verified baseline separates actual improvement from changes in well conditions, operating hours and external factors.

Agree on metering, data quality, attribution, the evaluation period and normalization before deployment. Track uncertainty and reconcile results jointly.

BASELINE / BEFORE

Production · bbl/day

Electricity · kWh/day

Downtime · hours

Workovers · count

Lifting cost · per barrel

Carbon intensity · CO₂e/barrel

VERIFIED / AFTER

Production uplift

Energy reduction

Avoided downtime

Maintenance improvement

Incremental cash value

Carbon-intensity improvement

THE NEXT STEP IS AN EVALUATION

Before the next major CAPEX decision, start with your existing wells.

Tell Us About Your Field ↗

Start small. Measure carefully. Scale when the economics are demonstrated.